Sale!

ABB | FER121080K1S1S2B1B1A2A2A1M1 | WATERMASTER MODBUS FEX100

Original price was: $10,000.00.Current price is: $1,457.00.

Product NO:FER121080K1S1S2B1B1A2A2A1M1

Brand:ABB

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

This technical datasheet provides comprehensive specifications, installation procedures, routine maintenance guidelines, troubleshooting steps, safety precautions, and frequently asked questions for the ABB WATERMASTER MODBUS FEX100 (FER121080K1S1S2B1B1A2A2A1M1) electromagnetic flowmeter. Engineered for accurate water and wastewater flow measurement, this high-performance instrument ensures reliable data collection and seamless network integration.

ABB WATERMASTER MODBUS FEX100 FER121080K1S1S2B1B1A2A2A1M1 V3.CWA -TRIED & TESTED Image 1 of 4

⚙ Product Technical Parameters

  • 1. Brand: ABB
  • 2. Model: WATERMASTER MODBUS FEX100 / FER121080K1S1S2B1B1A2A2A1M1
  • 3. Series: WaterMaster Electromagnetic Flowmeter Series
  • 4. Product Name: Modbus-Enabled Flow Transmitter and Sensor Assembly
  • 5. Country of Origin: United Kingdom / Germany
  • 6. Physical State: Rugged industrial flowmeter housing with integrated electronics
  • 7. Dimensions: Modular nominal diameter configuration (Standard pipeline installation format)
  • 8. Weight: 12.5 kg (Depending on exact flange and spool dimensions)
  • 9. Origin Location: European Manufacturing Facility
  • 10. Power Consumption: 15W (Max operational draw under rated AC/DC supply voltage)

 

📋 Initial Operation Checklist

Before energizing and commissioning the flowmeter for the first time, verify all physical and electrical configurations to prevent measurement errors or hardware damage:

  • Inspect the sensor body, flow tube lining, electrodes, and terminal enclosure for transit damage or moisture ingress.
  • Confirm that the power supply voltage matches the instrument rating specifications with proper earth grounding.
  • Verify that pipe orientation, upstream/downstream straight pipe lengths, and flow direction arrows align correctly with process requirements.
  • Ensure ambient operating temperature and process fluid temperature fall within the specified operational limits.
  • Check communication wiring and Modbus network termination settings prior to system startup.

 

🛠 Routine Maintenance and Upkeep

Regular maintenance ensures optimal long-term measurement accuracy and operational reliability across industrial water management networks:

  • Perform bi-annual visual inspections to check for external corrosion, cable gland integrity, and flange bolt tightness.
  • Clean the meter’s exterior using a soft, dry cloth; avoid high-pressure water jets directly on electronic housings unless rated for IP67/IP68.
  • Periodically verify zero-flow stability and check diagnostic logs via the local display or Modbus communication link.
  • Inspect grounding rings and electrode status during scheduled plant shutdown windows to prevent buildup or fouling.

 

🔧 Troubleshooting and Common Issues

Systematic problem isolation minimizes downtime when operational or communication anomalies arise:

  • No Display / Power Failure: Check external power supply breakers, measure terminal voltage, and inspect internal fuse continuity.
  • Modbus Communication Timeout: Verify RS-485 polarity, check baud rate and parity settings, and ensure proper network termination resistors are installed.
  • Erratic Flow Readings: Check for air bubbles in the pipeline, ensure the flow tube is completely full, and verify proper grounding and shielding.
  • Empty Pipe Alarm Active: Verify that the process pipeline is completely filled with conductive liquid and check electrode cabling.

 

🛡 Safety Precautions

Strict adherence to safety guidelines protects personnel from electrical hazards and prevents permanent instrument damage:

  • Always isolate and lock out main electrical power before opening terminal compartments or servicing wiring.
  • Exercise caution when handling heavy flowmeter assemblies; use proper lifting equipment and personal protective equipment (PPE).
  • Ensure process pressure and temperature do not exceed the maximum ratings stamped on the meter nameplate.
  • Ensure all electrical wiring complies strictly with local electrical codes and hazardous area certifications (if applicable).

 

❓ Frequently Asked Questions (Q&A)

  • Q1: Can the Modbus communication parameters be modified on-site?
    • A1: Yes, station address, baud rate, parity, and transmission mode can be configured locally via the human-machine interface (HMI) or remotely via configuration software tools.
  • Q2: What is required if the meter displays an empty pipe condition while liquid is flowing?
    • A2: Ensure the sensor is completely filled, check that the process fluid meets the minimum conductivity requirement, and verify electrode cleanliness and grounding connections.
  • Q3: Is recalibration required after replacing the transmitter electronics module?
    • A3: The calibration data is stored in the sensor’s non-volatile memory (SensorFlash); therefore, replacing the transmitter module does not require a complete recalibration, as parameters are automatically uploaded.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.