Sale!

ABB PM858 | 3BSE093350R1 | Processor Unit

Original price was: $10,000.00.Current price is: $1,240.00.

Product NO:PM858 3BSE093350R1

Brand:ABB

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

Product Specifications & Datasheet

  • Brand: ABB
  • Model: PM858 (3BSE093350R1)
  • Series: AC 800M Controller Family
  • Product Name: Processor Unit / Central Processing Unit
  • Place of Origin: Sweden
  • Lifecycle Status: Active / Industrial Automation Hardware
  • Dimensions: 135 mm x 110 mm x 105 mm
  • Weight: 0.70 kg
  • Origin Country: Sweden
  • Power Rating: 24V DC (Powered via CEX-Bus / Baseplate)

 

Operating Procedures & Usage Guidelines

  • Pre-Installation Check: Ensure the control system baseplate is powered off and inspect the module connector pins for cleanliness and alignment.
  • Mounting: Carefully guide the processor unit onto the designated slot on the DIN rail and secure it firmly onto the ABB baseplate.
  • Memory & Battery: Install or check the backup battery unit and secure the CompactFlash memory card containing the control project if applicable.
  • Power-Up & Boot: Apply power to the system and monitor the front-panel LED indicators (such as Run, Error, and Battery) to verify normal startup and firmware execution.

 

Emergency Shutdown Operation

  • Master Power Disconnection: Trip the primary power distribution breaker supplying the controller cabinet to perform an immediate emergency shutdown.
  • Safe State Transition: Ensure connected I/O safety loops and actuators drop to their pre-configured safe states upon loss of controller processing power.

 

Troubleshooting & Common Issues

  • Fault LED Illuminated: Connect via the engineering station (Control Builder) to read diagnostic logs and identify specific software or hardware faults.
  • Communication Failure: Check the Ethernet and CEX-Bus connections to ensure local control network links and peer-to-peer communications are intact.
  • Processor Overheating: Verify that cabinet cooling fans are operational and that ambient temperatures surrounding the controller rack remain within specified limits.

 

Routine Maintenance & Care

  • Battery Replacement: Periodically inspect and replace the internal backup battery according to the manufacturer schedule to preserve RAM data during power losses.
  • Firmware Management: Back up project files before performing any scheduled firmware upgrades or system configuration changes.
  • Dust Control: Clean cabinet air filters regularly to prevent dust accumulation on the processor cooling vents.

 

Frequently Asked Questions (Q&A)

  • Q: What is the role of the ABB PM858 processor in a control system?
    • A: It executes the user control logic, coordinates communication across modules, and manages process data within the AC 800M automation architecture.
  • Q: Is the PM858 processor suitable for redundant setups?
    • A: Yes, it supports CPU redundancy configurations to ensure high availability in critical industrial processes.
  • Q: How do I check the operational status of the unit?
    • A: Monitor the status LED indicators on the front faceplate and review diagnostics inside the engineering software environment.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.