Sale!

ABB | REF615E_1G HBFNAEGABC1ANA11G | Feeder Protection Control Relay

Original price was: $10,000.00.Current price is: $1,240.00.

Product NO:REF615E_1G

Brand:ABB

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

The ABB REF615E_1G (Order Code: HBFNAEGABC1ANA11G) is a dedicated feeder protection and control relay belonging to ABB’s Relion® 615 series. It is engineered for the protection, control, measurement, and supervision of utility and industrial power distribution systems, including radial feeders in primary and secondary substations.

  • Brand: ABB (Relion® Product Family)
  • Model: REF615E_1G
  • Order / Catalog Code: HBFNAEGABC1ANA11G
  • Series: Relion 615 Feeder Protection Line
  • Product Name: Feeder Protection and Control Relay (Includes integrated power supply and binary/analog I/O configuration)
  • Origin Country: Finland / Sweden
  • Lifecycle Status: Active / Standard Industrial Protection Line
  • Enclosure Type: Flush-mounted or wall-mounted relay case with pull-out plug-in unit design
  • Weight: Approx. 3.5 kg to 5.0 kg (Depending on auxiliary options and terminal blocks)
  • Auxiliary Power Supply: Wide-range internal SMPS (typically supporting DC and AC auxiliary voltages such as 48–125V DC or 100–240V AC depending on specific variant configuration)

ABB REF615E_1G HBFNAEGABC1ANA11G POWER SUPPLY PROTECTION RELAY WITHOUT... Image 1 of 4

🔍 Initial Operation Checklist

  • Visual and mechanical inspection: Check the relay housing, display panel, function keys, and rear terminal blocks thoroughly for any shipping damage or environmental wear.
  • Confirm order code configuration: Verify that the complete order string (HBFNAEGABC1ANA11G) matches the exact hardware, communication protocol (e.g., IEC 61850 / Modbus), and I/O card matrix required for your switchgear panel.
  • Check panel mounting: Ensure the relay case is securely flush-mounted into the switchgear cutout or mounted onto its test block framework with proper locking latches engaged.
  • Validate auxiliary power: Confirm that the auxiliary control power voltage applied to the power supply terminals matches the relay’s rated input window prior to closing breakers.
  • Verify communication links: Check that fiber-optic or shielded Ethernet cables (for IEC 61850 or Modbus TCP) are properly terminated and locked into the communication slots.

 

🛠️ Routine Maintenance & Care

  • Environmental surveillance: Ensure that indoor switchgear compartments maintain stable ambient operating temperatures between -10°C and +55°C and low relative humidity.
  • Battery and self-supervision checks: Routinely review the relay’s self-supervision (IRF) diagnostic alarm contact and front-panel status LEDs to ensure internal health.
  • Terminal tightening: Annually inspect rear ring-lug or compression screw terminals for secure mechanical seating to prevent high-resistance connections under vibration.
  • Firmware and configuration backups: Periodically export relay parameter settings and configuration files using ABB’s PCM600 tool suite during scheduled maintenance windows.

 

⚠️ Troubleshooting & Common Issues

  • Internal Relay Fault (IRF LED active): Check internal diagnostics via the front LCD menu or PCM600 software to isolate hardware watchdog or memory exceptions.
  • Auxiliary power supply failure: Verify input voltage stability, terminal seating, and internal power supply fuses if the display screen and front LEDs fail to illuminate.
  • Communication dropouts: Inspect network switches, fiber-optic link integrity, and IP/station address settings if substation SCADA or IEC 61850 GOOSE messaging fails.

 

🛡️ Safety Precautions

  • Qualified personnel only: Installation, parameter setting, testing, and wiring modifications must be executed exclusively by certified protection and control (P&C) electrical engineers.
  • Current transformer (CT) safety: Never open-circuit secondary CT wiring while primary lines are energized; always short-circuit CT terminals via test blocks before extracting the relay plug-in unit.
  • Electrostatic discharge (ESD) safety: Use a properly grounded wrist strap when handling exposed electronic circuit boards or internal components during pull-out procedures.

 

❓ Frequently Asked Questions (Q&A)

Q1: What is the primary function of the ABB REF615 relay?

A1: It provides comprehensive protection, fault recording, and control for utility and industrial electrical distribution feeders, incorporating features like overcurrent, earth-fault, voltage, and frequency protection.

Q2: Can the relay plug-in unit be extracted while the switchgear is live?

A2: The 615 series features a draw-out design with automatic CT shorting mechanisms on the base unit, but extraction should strictly follow utility safety protocols and require proper authorization to avoid operational disruptions.

Q3: What engineering software is used to configure the REF615E_1G?

A3: Configuration, setting adjustments, and disturbance record analysis are performed using ABB’s PCM600 (Protection and Control IED Manager) software suite.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.