Sale!

ABB | SPER 1B1 C4 | Circuit Supervision Relay

Original price was: $10,000.00.Current price is: $1,159.00.

Product NO:SPER 1B1 C4

Brand:ABB

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

The ABB SPER 1B1 C4 is a specialized microprocessor-based circuit supervision relay engineered specifically for electric power utility and heavy industrial substation applications. It is designed to continuously monitor the integrity of critical control circuits, such as trip circuits, circuit breaker auxiliary contacts, and DC auxiliary power supplies. By detecting open circuits, high-resistance faults, or supply failures before they compromise system protection, the SPER 1B1 C4 prevents catastrophic failure to trip during an emergency, ensuring high reliability and safety across electrical power networks.

ABB SPER 1B1 C4 Circuit Supervision Relay Image 1 of 4

📊 Product Datasheet

Parameter Value
Brand ABB
Model SPER 1B1 C4
Series SPxR / Substation Protection and Supervision Series
Product Name Circuit Supervision Relay / Trip Circuit Monitor
Origin Sweden / Finland
Product Status Active / Industrial Automation & Substation Spare Part
Dimensions Standard ABB COMBIFLEX / Flush-Mount Enclosure Format
Weight 0.8 kg
Country of Origin Sweden (SE) / Finland (FI)
Power Rating Auxiliary DC Supply: 48V / 60V / 110V / 220V DC (Model Dependent)

🛠️ Operation Standards and Usage Methods

🔸 Mounting and Wiring: Install the relay securely onto a standard panel cutout or within a certified relay test rack. Ensure all external wiring is terminated securely to the rear terminal blocks in strict accordance with the official ABB connection diagram to prevent monitoring errors.

🔸 Configuration and Testing: Configure the internal jumpers or DIP switches (if applicable) to match the DC auxiliary voltage and specific trip circuit monitoring requirements. Utilize built-in test features or secondary injection testing to verify trip/alarm contact operations prior to final commissioning.

🔸 Operational Monitoring: Keep the auxiliary power supply energized continuously. The front-panel LED indicators will display normal operational status and signal any detected loop anomalies instantly.

🚨 Emergency Shutdown Procedures

🔺 System Isolation: In the event of a critical relay malfunction or during wiring modifications, open the associated test switches or trip circuit links to isolate the relay safely without inadvertently tripping the main circuit breaker.

🔺 Power Disconnection: Switch off the DC auxiliary power supply feeding the SPER 1B1 C4 unit before performing any physical maintenance, internal inspection, or hardware replacement.

🔺 Post-Intervention Verification: After completing any work on the supervised circuit, thoroughly verify that all supervision contacts close properly and that no alarm signals remain active before returning the protection scheme to service.

🔍 Troubleshooting and Common Issues

⚠️ Issue 1: False Trip Alarm or Supervision Failure LED

Troubleshooting Method: Check the external trip circuit wiring for loose terminal connections, high resistance, or intermittent grounding. Verify that the auxiliary DC voltage supplied to the relay matches its rated operating range.

⚠️ Issue 2: Relay Fails to Power On

Troubleshooting Method: Use a digital multimeter to measure the DC supply voltage directly across the relay input terminals. Check upstream Miniature Circuit Breakers (MCBs) or fuses protecting the auxiliary power rail.

⚙️ Routine Maintenance and Care

🔹 Periodic Visual Inspection: Conduct routine inspections every six months to check that terminal block screws are tight, enclosure surfaces are clean, and front-panel indicator LEDs function correctly.

🔹 Functional Testing: Periodically perform simulated circuit break tests to ensure that the supervision relay correctly detects an open-circuit condition and outputs the corresponding alarm signal.

🔹 Environmental Management: Ensure that the substation control room or relay panel enclosure maintains a clean, dry environment with stable ambient temperatures to prevent premature electronic aging.

💡 Frequently Asked Questions Q&A

❓ Q1: What is the primary purpose of the SPER 1B1 C4 relay?

💬 A1: Its primary purpose is to continuously supervise the integrity of high-voltage circuit breaker trip circuits, ensuring that a broken wire or power failure will be signaled before an actual fault requires the breaker to trip.

❓ Q2: Can the SPER 1B1 C4 monitor circuits when the breaker is both open and closed?

💬 A2: Yes, advanced circuit supervision relays are designed to inject a very small, harmless supervisory current that monitors the circuit continuity regardless of whether the main circuit breaker is in the open or closed position.

❓ Q3: How should spare supervision relays be stored?

💬 A3: Spare units should be stored in a clean, dry, climate-controlled environment free from dust, corrosive gases, and extreme mechanical vibrations, preferably in their original packaging.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.