Sale!

ASP 04-52006-3-001 | NX SYSTEM INTERFACE BOARD

Original price was: $10,000.00.Current price is: $1,100.00.

Product NO:04-52006-3-001

Brand:ASP

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

The ASP 04-52006-3-001 is a specialized System Interface Board (SIB) designed for the STERRAD NX sterilization system by Advanced Sterilization Products. This PCB module acts as the central communication hub, managing data exchange between the system’s sensors, vacuum pumps, hydrogen peroxide delivery components, and the main controller. It is engineered to maintain high levels of precision and safety during the critical sterilization process, ensuring all cycle parameters are strictly monitored and executed.

ASP 04-52006-3-001 NX SYSTEM INTERFACE BOARD Advanced Sterlization Products

Technical Specifications

Parameter Description
Model 04-52006-3-001
Manufacturer Advanced Sterilization Products (ASP)
System STERRAD NX Sterilization System
Function System Interface/Communication Board
PCB Features High-reliability data bus management
Weight Approximately 0.40 kg
Origin USA

 

Operational Guidelines & Usage

🔹 Startup Sequence

  1. Ensure the board is properly seated in the main electronics bay of the STERRAD NX unit.
  2. Verify all peripheral wiring connectors (sensor inputs, power, and I/O harnesses) are fully engaged and locked.
  3. Power on the sterilization unit. The SIB will undergo an internal self-diagnostic routine.
  4. Observe the system HMI for a “System Ready” status, indicating the interface board has successfully established communication with the main processor.

🔹 Shutdown Sequence

  1. Terminate any active sterilization cycle through the system software to prevent process abortion errors.
  2. Power down the unit using the main system disconnect switch.
  3. Once the system is fully de-energized, verify the interface board status indicators are off before performing any maintenance.
  4. Utilize ESD-safe practices when handling or replacing the board to protect internal logic circuits.

🔹 Normal Operational Flow

  1. The board monitors inputs from pressure transducers, temperature sensors, and door interlock switches.
  2. It processes these inputs to provide real-time feedback to the system controller, ensuring cycle conditions remain within specified limits.
  3. It triggers actuators and pumps required for the vacuum and sterilization delivery phases.
  4. All operational data is logged and transmitted to the HMI for operator review and process documentation.

🔹 Parameter Configuration

  1. The 04-52006-3-001 is typically a factory-programmed component.
  2. Calibration and sensitivity settings for attached sensors are performed through the service mode of the STERRAD NX controller.
  3. No hardware-level configuration (e.g., jumper settings) is required unless specified in the system-specific maintenance manual during a board replacement.

🔹 Mode Switching

  • Active Cycle Mode: The board is actively monitoring and controlling sterilization inputs.
  • Service/Diagnostic Mode: Allows technicians to manually toggle outputs and verify sensor inputs for troubleshooting purposes. This mode is restricted via a service-level password.

 

Common Questions & Answers (Q&A)

💡 Q: What does a “Communication Error” on the NX HMI mean relative to this board?

A: It indicates that the main controller cannot read data from the System Interface Board. Check the ribbon cables connecting the SIB to the main processor for signs of oxidation or loose seating.

💡 Q: Can this board be cleaned if it collects dust?

A: Use only clean, dry compressed air to remove debris. Never apply liquids or solvents to the SIB, as these can interfere with the high-precision signal pathways and lead to sterilization cycle failures.

💡 Q: Is the ASP 04-52006-3-001 board hot-swappable?

A: No. It is critical to power down the entire STERRAD system before removing or inserting this board to prevent damage to the backplane or corruption of the system firmware.

💡 Q: Why does the system trigger a “Sensor Failure” alarm?

A: If multiple sensors show an error, the fault likely lies with the SIB’s analog input processing circuits. Verify the power supply voltage to the SIB; if the voltage is stable, the SIB may require replacement.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.