Sale!

COMPRESSOR CONTROLS CORP TMPU-1002 | 17-505102-001 Control Board

Original price was: $10,000.00.Current price is: $1,500.00.

Product NO:TMPU-1002

Brand:SERVO board

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

The COMPRESSOR CONTROLS CORP (CCC) TMPU-1002 is a high-reliability Turbo Machinery Processing Unit board, specifically designed for the Series 3+ and Series 4 control systems. This board functions as the primary computational engine for specialized turbomachinery control applications, including antisurge, performance, and load-sharing control. The Rev:B version features optimized logic circuits to handle the high-speed data processing required for millisecond-level response times in centrifugal and axial compressor protection.

  • System Compatibility: CCC Series 3+ / Series 4 Control Platforms
  • Processing Core: High-speed proprietary microprocessor for real-time control
  • Input Signal Sampling: Supports high-frequency analog and digital inputs
  • Response Time: Sub-millisecond execution for critical antisurge loops
  • Power Requirements: 24V DC Internal Supply (standard rack power)
  • Onboard Memory: Integrated Flash and RAM for control algorithm storage and diagnostic logging
  • Redundancy Support: Dual-redundant communication bus interface

COMPRESSOR CONTROLS CORP TMPU-1002 17-505102-001 REV:B BOARD CONTROL

 

Product Datasheet

Feature Specification
Model CCC TMPU-1002
Part Number 17-505102-001
Revision REV:B
Dimensions 215 x 165 x 25 mm
Weight 0.48 kg
Country of Origin USA
Interface High-density gold-plated edge connector
Operating Temp -20°C to +60°C

 

Application Fields

This control board is a critical component in global energy infrastructure, particularly in:

  • Antisurge Control: Protecting large compressors from catastrophic surges during process fluctuations.
  • LNG Liquefaction: Managing complex refrigeration compressor strings in liquefied natural gas plants.
  • Petrochemical Extraction: Load sharing and speed control for multi-stage gas compressors.
  • Power Generation: Precise fuel gas booster compressor control for gas turbines.
  • Refinery Off-Gas: Balancing suction and discharge pressures in vapor recovery units.

 

Product Instructions

  1. Preparation: Before servicing, ensure the compressor train is in a safe state or that the control system is in “Manual/Bypass” mode if a redundant partner board is taking the load.
  2. ESD Safety: This board contains ultra-sensitive processing components. Use a grounded wrist strap and an ESD-protected work area for all handling.
  3. Mechanical Installation: Align the TMPU-1002 with the guide rails in the CCC card cage. Slide the board inward until the edge connector is fully seated in the backplane.
  4. Configuration: Upon installation, the board may require a firmware upload or parameter synchronization from the host engineering workstation (Configurator) to match the specific compressor map.
  5. Status Check: Monitor the onboard status LEDs. A steady green “Run” or “OK” light indicates the board has passed its internal self-test and is communicating with the system bus.

 

Q&A – Common Questions

Q1: What is the difference between the TMPU-1001 and the TMPU-1002? A1: The TMPU-1002 is an upgraded processing unit with higher memory capacity and faster clock speeds, allowing it to handle more complex control algorithms and higher I/O densities than the earlier 1001 model.

Q2: Can I swap a Rev:A board with a Rev:B board? A2: Generally, yes. Revision B is backward compatible with Revision A hardware. However, ensure the system software version supports the minor hardware changes introduced in the later revision.

Q3: How do I troubleshoot a “CPU Fail” error on the board? A3: First, verify the rack power supply voltages. If the power is stable, try reseating the board to ensure the edge connector is clean and properly aligned. If the error persists, the board may have internal memory or processor failure and requires professional repair.

 

Related Product Recommendations

  1. CCC 17-505101-001 | TMIO-1001 Input/Output Module
  2. CCC 17-505103-001 | TMPW-1001 Power Supply Board
  3. CCC 17-505105-001 | TMBP-1001 Backplane Assembly
  4. Bently Nevada 3500/05 | System Rack for Machinery Protection
  5. Honeywell 51403483-100 | TDC 3000 Process Manager Board
brand mingpian

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.