Sale!

GE | DS200SLCCG3A | LAN Interface Communication SLCC

Original price was: $10,000.00.Current price is: $1,457.00.

Product NO:DS200SLCCG3A

Brand:GE

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

GE DS200SLCCG3A / DS200SLCCG3RFG-W01 LAN Interface Communication SLCC Board is an advanced networking and communication printed circuit board assembly engineered specifically for the General Electric Mark V gas and steam turbine control system. Designed to manage high-speed data exchange, this module facilitates robust local area network (LAN) communication between core controllers, operator interfaces, and distributed system racks across power generation facilities.

 

Product Specifications (Datasheet)

  • Brand: GE (General Electric)
  • Model: DS200SLCCG3A (Compatible with variant DS200SLCCG3RFG-W01)
  • Series: Mark V LAN Communications
  • Product Name: LAN Interface Communication SLCC Board
  • Place of Origin: United States
  • Lifecycle Status: Obsolete / Specialized Refurbished Supply
  • Dimensions: Standard Mark V printed circuit board form factor
  • Weight: Approx. 1.6 lbs (0.73 kg)
  • Country of Origin: USA
  • Power Consumption: Supplied via system rack regulated low-voltage backplane rails

 

Operating Guidelines and Usage Methods

Proper integration and handling of the communication board require strict adherence to industrial electronic safety and data-bus shielding protocols.

  • ESD Precautions: Always wear a certified grounded electrostatic discharge (ESD) wrist strap when handling the circuit board to protect sensitive communication microchips from static damage.
  • Network Cable Security: Ensure all coaxial or twisted-pair network cables are securely connected to the proper onboard transceivers or interface ports to prevent packet loss or link dropping.
  • Environmental Control: Operate the host control cabinet within a clean, climate-controlled environment protected from excessive humidity, dust, and aggressive chemical vapors.

 

Power-On and Power-Off Sequence

Adhering to correct energization protocols prevents electrical transients and protects delicate transceiver components within the Mark V architecture.

  • Power-On Sequence:
    1. Confirm that the DS200SLCCG3A board is securely and evenly seated into its designated VME rack slot and all network connections are verified.
    2. Switch on the primary cabinet power distribution feeds supplying the Mark V system power supply units.
    3. Monitor onboard diagnostic LEDs and system software interfaces to verify normal initialization and network link synchronization.
  • Power-Off Sequence:
    1. Safely halt active communication polling or take the associated control rack offline via the operator interface.
    2. Power down the main electrical feeds supplying the system control racks.
    3. Allow adequate time for internal filter capacitors to completely discharge before removing or servicing the circuit board.

 

Product Instructions

The LAN interface communication board acts as a vital bridge for transmitting control commands and diagnostic telemetry across the Mark V ARCNET or Ethernet-based architecture. Periodically inspect communication cables and connectors for signs of corrosion or physical wear. Keep cabinet ventilation paths clean to ensure optimal thermal stability for high-speed data processing components.

 

Frequently Asked Questions (Q&A)

  • Q: What is the primary function of the DS200SLCCG3A board?
    • A: It functions as a LAN interface communication module within the GE Mark V system to manage high-speed data transmission between control racks and operator nodes.
  • Q: Are brand-new OEM units readily available on the market?
    • A: Because the Mark V series is obsolete, replacement units are typically sourced through professional industrial surplus and certified refurbishment providers.
  • Q: What should I check first if network communication drops between racks?
    • A: Verify the physical seating of the SLCC board in its slot, inspect network cabling integrity, and check diagnostic status LEDs for error codes.

 

Recommended Alternative Series and Models

  • GE Mark V DS200TCCAG1A
  • GE Mark V DS200TCQAG1AFC
  • GE Mark V DS200PCCAG1ACC
  • GE Mark V DS200CTBAG1A
  • GE Mark VI IS200TBCIH1A
  • GE Mark VIe IS220PTCCH1A
  • GE EX2100 IS200EPSMG1A
  • GE Fanuc IC697CPU771
  • GE Multilin 469
  • GE Multilin 850

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.