Sale!

GE DS200TBQBG1A DS200TBQBG1ACB TERMINAL BOARD PC BOARD SDCC MARK V

Original price was: $10,000.00.Current price is: $2,000.00.

Product NO:DS200TBQBG1A DS200TBQBG1ACB

Brand:PLC

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

Technical Parameters

  • Manufacturer: GE (General Electric)
  • Model Number: DS200TBQBG1A
  • Revision: CB (DS200TBQBG1ACB)
  • System Series: Speedtronic Mark V
  • Board Type: Termination Board (TBQB)
  • Function: Signal routing and termination for the SDCC (Drive Control Board)
  • Interface: Multi-pin ribbon cable connectors and screw terminal blocks
  • Compatibility: GE Mark V LM (Load Management) and Drive Control Systems

 

Product Datasheet

Specification Details
Model DS200TBQBG1A
Origin USA
Dimensions 24.8 cm x 10.2 cm
Weight 0.45 kg
Revision Level CB
Connector Type BERG connectors and toggle terminals
Operating Temp 0°C to +60°C
Mounting Cabinet standoffs / Rack mount

 

Application Fields

The DS200TBQBG1A serves as the physical interface for various GE Mark V drive applications:

  • Gas Turbine Control: Relaying input/output signals between field devices and the SDCC processor.
  • Excitation Systems: Managing signal termination for generator excitation control logic.
  • Industrial Drive Systems: Used in heavy-duty motor drives to organize wiring and reduce electromagnetic interference.
  • Power Generation: Integrated into Mark V “R”, “S”, and “T” cores for signal distribution.

GE DS200TBQBG1A REV CB / DS200TBQBG1ACB TERMINAL BOARD PC BOARD SDCC MARK V

Product Instructions

  1. Safety Isolation: Ensure all power sources to the Mark V rack are locked out before removing the terminal board.
  2. Cable Labeling: Clearly mark all ribbon cables and field wires before disconnection to ensure correct re-attachment.
  3. Mounting: Secure the board using all provided screw holes to maintain proper grounding through the cabinet frame.
  4. Wiring: Use the screw terminals for field wiring; ensure no frayed wires are present to prevent short circuits.
  5. Inspection: Check the BERG connectors for bent pins or debris before plugging in the ribbon cables from the SDCC board.

 

Q&A

Q1: What is the relationship between this board and the SDCC board? A1: The TBQB (DS200TBQBG1A) acts as the physical connection point for field wiring, which then passes signals via ribbon cables to the SDCC (Drive Control Board) for processing.

Q2: Does the “CB” revision matter for my installation? A2: Revision “CB” is a specific hardware update. While GE Mark V boards are often backward compatible, you should verify the jumper settings and cable orientation to match your original “A” or “B” revision.

Q3: Can I repair individual terminals on this board? A3: While screw terminals can sometimes be replaced, damage to the PCB traces usually requires a full board replacement to maintain system reliability in turbine control.

 

Recommended Similar Models

  1. GE DS200TBQBG1B
  2. GE DS200SDCCG1A
  3. GE DS200TCPSG1A
  4. GE DS200TBCBG1A
  5. GE DS200TBQAG1A
brand mingpian

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.