Sale!

GE | DS200TCTGG1AEE | Turbine Trip (TCTG) Relay Board

Original price was: $10,000.00.Current price is: $1,457.00.

Product NO:DS200TCTGG1AEE

Brand:GE

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

GE DS200TCTGG1AEE is a specialized Turbine Trip (TCTG) printed circuit board assembly engineered specifically for the General Electric Mark V Speedtronic gas and steam turbine control systems. Designed to manage critical fuel shutoff mechanisms and provide fail-safe protection logic, this relay board oversees primary and emergency trip operations across heavy-duty power generation architectures.

ht.innovplc.com+ 1

Product Specifications (Datasheet)

  • Brand: GE (General Electric)
  • Model: DS200TCTGG1AEE (Compatible with variant firmware/hardware revisions like G1AF)

    Best PLC DCS Spare Parts Supplier – RuiMingSheng

  • Series: Mark V Speedtronic Turbine Control

    AX Control

  • Product Name: Turbine Trip Board / TCTG Relay Board

    ht.innovplc.com

  • Place of Origin: United States

    Best PLC DCS Spare Parts Supplier – RuiMingSheng

  • Lifecycle Status: Obsolete / Specialized Industrial Surplus
  • Dimensions: Approx. 9.8 in × 7.1 in (250 mm × 180 mm)

    ht.innovplc.com

  • Weight: Approx. 2.95 lbs (1.34 kg)

    ht.innovplc.com

  • Country of Origin: USA

    Best PLC DCS Spare Parts Supplier – RuiMingSheng

  • Power Consumption: Regulated low-voltage DC supplied via system core backplane rails

 

Operating Guidelines and Usage Methods

Proper integration and handling of the trip relay board require strict adherence to safety instrumentation and electronic handling procedures.

  • ESD Precautions: Always utilize a certified grounded electrostatic discharge (ESD) wrist strap when handling the printed circuit board to prevent static damage to sensitive semiconductor logic and relay driver ICs.
  • Core Slot Placement: The TCTG board is typically installed within position 4 of the Mark V control core, managing designated system communication and protection links.

    Best PLC DCS Spare Parts Supplier – RuiMingSheng

  • Environmental Control: Operate the turbine control cabinet within a clean, climate-controlled environment shielded from excessive humidity, airborne dust, and severe temperature shifts.

 

Power-On and Power-Off Sequence

Strict energization sequencing protects high-reliability protection loops and prevents inadvertent trip signals during startup.

  • Power-On Sequence:
    1. Confirm that the DS200TCTGG1AEE board is securely seated into its designated Mark V core slot and all backplane interface connectors are aligned.
    2. Switch on the primary cabinet power distribution feeds supplying the Mark V control racks.
    3. Monitor diagnostic LED indicators and operator interface software to verify normal self-tests and trip circuit health.
  • Power-Off Sequence:
    1. Safely take the turbine control system offline or ensure the unit is in a non-running state before servicing protection hardware.
    2. Power down the main electrical feeds supplying the system control racks.
    3. Allow adequate time for internal filter capacitors to completely discharge before extracting or servicing the circuit board.

 

Product Instructions

The TCTG board coordinates turbine safety via Primary Trip Relays (PTRs)—managed by the control system processor—and Emergency Trip Relays (ETRs)—managed by core action boards requiring a 2-out-of-3 voting logic. It also houses synchronizing relays and handles emergency servo-clamp functions via hardware jumper settings (such as J1). Inspect relay contacts and terminal connections during scheduled maintenance outages.

Best PLC DCS Spare Parts Supplier – RuiMingSheng+ 1

Frequently Asked Questions (Q&A)

  • Q: What system utilizes the DS200TCTGG1AEE board?
    • A: It is deployed within the GE Mark V Speedtronic turbine control architecture as a core trip and protection module.

      ht.innovplc.com

  • Q: What is the primary function of this board?
    • A: It controls turbine fuel shutoff valves, coordinates primary and emergency trip relays (PTR and ETR), and handles system synchronization.

      ht.innovplc.com

  • Q: What should be checked if a trip channel fails to clear?
    • A: Verify board seating in core slot 4, check 24 VDC power supply rails, and inspect diagnostic LEDs for communication or voter mismatch errors.

      ht.innovplc.com

 

Recommended Alternative Series and Models

  • GE Mark V DS200TCQAG1AFC
  • GE Mark V DS200TCRAG1A
  • GE Mark V DS200CTBDG1A

    AX Control

  • GE Mark VIe IS220PTCCH1A
  • GE Mark VIe IS420UCSBH4A
  • GE Mark VI IS200VAICH1A
  • GE Mark VI IS200TVIBH2B
  • GE EX2100 IS200EPSMG1A
  • GE Multilin 469
  • GE Multilin 850

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.