Sale!

GE IS200TVBAH2ACC | Mark VI VME Vibration Termination Board

Original price was: $10,000.00.Current price is: $1,104.00.

Product NO: IS200TVBAH2ACC

Brand:GE

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

The GE IS200TVBAH2ACC is a Vibration Termination Board (TVBA) designed for the Mark VI Speedtronic turbine control system. It serves as the dedicated interface for vibration, position, and speed sensors, providing essential monitoring and protection for rotating machinery.

 

Product Parameters (Datasheet)

  • Model Number: IS200TVBAH2ACC
  • Board Type: TVBA (Vibration Termination Board)
  • System Series: Speedtronic Mark VI
  • Input Channels: * 8x Vibration Inputs (Proximity probes or accelerometers)
    • 2x Keyphasor/Position Inputs
  • Compatibility: Works with VVIB (Vibration Processor) VME cards
  • Redundancy: Supports Simplex and TMR (Triple Modular Redundant) configurations
  • Connectors: 37-pin D-type connectors for signal routing to the VME rack
  • Termination: High-density terminal blocks for direct field sensor wiring
  • Revision: H2ACC (Enhanced revision with specific filtering for H2 series hardware)
GE IS200TVBAH2ACC

GE IS200TVBAH2ACC

GE IS200TVBAH2ACC

GE IS200TVBAH2ACC

GE IS200TVBAH2ACC

GE IS200TVBAH2ACC

Country of Origin

This board was engineered and manufactured by General Electric (GE) in the USA, designed to meet the rigorous safety requirements of power plant and industrial turbine environments.

 

Application Fields

The IS200TVBAH2ACC is a critical safety component for high-speed rotating equipment:

  • Gas & Steam Turbines: Continuous monitoring of shaft vibration and bearing health.
  • Hydro Turbines: Tracking vibration profiles and mechanical alignment.
  • Large Compressors: Protecting industrial compressors from catastrophic mechanical failure.
  • Generators: Monitoring structural vibration and eccentricity.
  • Predictive Maintenance: Providing raw data for vibration analysis and trend monitoring.

 

Product Usage Instructions

  1. Mounting: Install the TVBA onto the cabinet’s DIN rail. Ensure it is positioned within reach of the sensor lead-in cables and the processor ribbon cables.
  2. Sensor Wiring: Connect Bently Nevada or similar proximity probes and accelerometers to the terminal blocks. Ensure shielding is terminated at the designated points to minimize signal noise.
  3. Keyphasor Setup: Connect the Keyphasor (phase reference) sensors to provide the timing signal required for synchronous vibration analysis.
  4. Cabling: Use shielded 37-pin cables to connect the TVBA ports (JR, JS, JT) to the VVIB vibration processor card located in the VME rack.
  5. Grounding: Verify the board is properly grounded. Vibration signals are millivolt-level and highly sensitive to ground loops or electromagnetic interference.

 

Product Technical Description

Technically, the IS200TVBAH2ACC acts as a signal conditioner and surge protector. It includes passive filters to remove high-frequency noise from the raw transducer signals before they are digitized by the VVIB card. The “H2” revision is specifically optimized for high-performance vibration processing, supporting both seismic and displacement-type probes. It features integrated protection against lightning and switching transients, ensuring that a field-side electrical event does not damage the expensive VME processors.

 

Q&A (Common Questions)

Q: Can this board provide power to my proximity probes? A: Yes, the TVBA (in conjunction with the VVIB card) provides the negative voltage (typically -24V DC) required by most standard industrial proximity probes.

Q: What is the difference between H1 and H2 revisions? A: The H2 revision typically includes updated component specifications and improved filtering for lower-frequency vibration detection compared to the earlier H1 designs.

Q: Why is my vibration reading showing “Bad” or “High” when the machine is off? A: This is often a sign of a “Gap” error (the probe is too close or too far from the shaft) or a broken signal wire. Check the DC voltage at the terminal block to verify the probe’s health.

Q: Does this board support TMR voting? A: Yes. In a TMR system, the signal is fanned out from the TVBA to three separate VVIB cards (R, S, and T) to ensure the turbine can safely trip even if one processor fails.

 

Similar Model Recommendations

  1. GE IS200TVBAH1A (Standard revision)
  2. GE IS200VVIBH1C (Vibration Processor VME Card)
  3. GE IS200TBAIH1C (Analog Input Termination)
  4. GE IS200TRPAH1A (Turbine Protection Termination)
  5. GE IS200TBCIH1C (Contact Input Termination)

For pricing or technical support regarding the GE IS200TVBAH2ACC, please contact our turbine protection specialists.

brand mingpian

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.