Sale!

GE | IS200TVBAH2ACC | Vibration Input Terminal Board (TVBA)

Original price was: $10,000.00.Current price is: $1,457.00.

Product NO:IS200TVBAH2ACC

Brand:GE

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

The IS200TVBAH2ACC is a specialized Vibration Input Terminal Board (TVBA) engineered specifically for General Electric Speedtronic Mark VI and Mark VIe gas and steam turbine control systems. Designed to interface directly with industrial vibration and proximity sensors, this terminal board conditions and routes critical machinery health signals to the system’s vibration I/O packs (such as the PVIB or YVIB packs).

 

Product Specifications (Datasheet)

  • Brand: GE (General Electric / GE Fanuc)
  • Model / Part Number: IS200TVBAH2ACC (Compatible with base series IS200TVBAH2A architectures)
  • Series: Mark VI / Mark VIe Speedtronic Turbine Control System
  • Product Name: Vibration Input Terminal Board (TVBA)
  • Place of Origin: United States
  • Lifecycle Status: Specialized Industrial Supply / Active Legacy Replacement
  • Sensor Compatibility: Interfaces directly with seismic (velocity) probes, Proximitors, Velomitors, Keyphasor reference probes, and accelerometers.
  • Input Channels: Supports up to 14 total sensor inputs across dual removable terminal blocks (including 8 vibration/position channels and specialized reference/Keyphasor inputs).
  • Buffered Outputs: Equipped with dedicated 9-pin and 25-pin D-sub connectors as well as individual Bayonet Nut Connector (BNC) coaxial ports per channel for integration with third-party monitoring equipment (such as Bently Nevada 3500 racks).

 

Operating Guidelines and Usage Methods

Proper integration and handling of vibration monitoring terminal boards require strict adherence to instrumentation wiring and electrical safety protocols.

  • ESD Precautions: Always utilize a certified grounded electrostatic discharge (ESD) wrist strap when handling associated electronic I/O packs to protect sensitive internal logic circuits from static damage.
  • Shield Grounding: Terminate all coaxial and shielded sensor cables securely to the designated chassis grounding bars immediately adjacent to the terminal blocks to prevent electromagnetic interference (EMI) and electrical noise from corrupting vibration measurements.
  • Environmental Control: Operate the host turbine control cabinet within a clean, climate-controlled environment protected from excessive humidity, conductive dust accumulation, and severe temperature fluctuations [-30°C to +65°C operating range].

 

Power-On and Power-Off Sequence

Adhering to correct energization protocols prevents signal transients and protects sensitive analog input circuitry within the Mark VI/VIe architecture.

  • Power-On Sequence:
    1. Confirm that all field sensor wiring, shield grounds, and backplane interface cables are correctly and securely terminated to the IS200TVBAH2ACC board.
    2. Plug the compatible Mark VIe vibration input I/O pack firmly into the board’s 37-pin interface connector and secure all locking mechanisms.
    3. Switch on the primary cabinet power distribution feeds and check operator workstation software to confirm normal module communication and channel status.
  • Power-Off Sequence:
    1. Safely take the affected vibration monitoring loops offline via the operator workstation software if required.
    2. Power down the system rack distribution feeds if complete electrical isolation is required prior to maintenance.
    3. Allow circuits to fully de-energize before unseating the plug-in I/O pack from the terminal board.

 

Product Instructions

The TVBA board acts as the permanent mechanical and electrical termination point for field vibration probes, featuring onboard electromagnetic interference (EMI) protection and pull-up biasing for open-circuit detection. It supports both simplex and Triple Modular Redundant (TMR) applications. Periodically inspect terminal screw torques, shield grounding bars, and BNC connection integrity during scheduled maintenance outages to prevent false vibration trips or signal attenuation.

 

Frequently Asked Questions (Q&A)

  • Q: What system utilizes the IS200TVBAH2ACC board?
    • A: It is deployed within the GE Mark VI and Mark VIe Speedtronic turbine control architecture for machinery vibration and proximity monitoring.
  • Q: Can I connect third-party vibration monitors like a Bently Nevada rack to this board?
    • A: Yes, the board includes dedicated BNC connectors and 9/25-pin D-sub outputs that provide unity-gain buffered signals for external monitoring equipment without disrupting the main control system.
  • Q: What should I check first if a vibration channel reports an open-circuit fault?
    • A: Verify field wiring and terminal block tightness, inspect the sensor probe cable continuity, and ensure the paired I/O pack is securely seated on the 37-pin connector.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.