Sale!

GE IS215UCVEH2AE Mark VIe VME Controller Card

Original price was: $10,000.00.Current price is: $1,071.00.

Product NO:IS215UCVEH2AE

Brand:GE

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

  • Model: GE IS215UCVEH2AE
  • Brand: GE (General Electric)
  • Series: Mark VI / Mark VIe Speedtronic Turbine Control System
  • Core Function: Executes turbine control logic, communications, and real-time process management
  • Product Type: VME Controller Card / CPU Processor Module
  • Key Specs: Intel Celeron processor, QNX real-time OS, Ethernet communication

Once a turbine control CPU becomes unstable, operators usually start seeing:

  • random communication alarms,
  • intermittent trips,
  • startup sequence failures,
  • or unexplained I/O timeout events.

For facilities still operating Mark VI systems, this module belongs in the “strategic spare” category, not ordinary consumable inventory.

GE IS215UCVEH2AE

GE IS215UCVEH2AE

GE IS215UCVEH2AE

GE IS215UCVEH2AE

GE IS215UCVEH2AE

GE IS215UCVEH2AE

Key Technical Specifications

  • Processor Type: Intel Celeron industrial processor
  • Processor Speed: 300 MHz (variant dependent)
  • Operating System: QNX real-time operating system
  • Memory: 32 MB DRAM standard configuration
  • Flash Storage: 16 MB flash memory
  • Communication Interface: 10/100BaseTX Ethernet (RJ45)
  • COM Ports: Serial COM interface supported
  • Bus Architecture: VME / VME64x rack interface
  • System Compatibility: GE Mark VI / Mark VIe Speedtronic platforms
  • Power Requirement: +5 V DC backplane supply
  • Power Consumption: Approx. 6 A typical load
  • Operating Temperature: -30 °C to 65 °C
  • Mounting Type: Single-slot VME rack installation
  • Typical Applications: Gas turbine, steam turbine, compressor control systems
  • Programming Environment: GE turbine control engineering tools / ToolboxST support

 

Installation & Configuration Guide

Stage 1: Pre-Installation Preparation (Approx. 20 minutes)

⚠️ This module directly affects turbine operation. Coordinate with operations before shutdown.

  1. Notify control room and turbine operators
  2. Transition turbine system into safe maintenance mode
  3. Shut down Mark VI rack power supply
  4. Disconnect redundant communication paths if applicable
  5. Wait minimum 10 minutes for capacitor discharge
brand mingpian

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.