Sale!

GE Mark VIe | IS200TTURH1CED Termination Board

Original price was: $10,000.00.Current price is: $1,085.00.

Product NO:IS200TTURH1CED

Brand: GE

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

The GE IS200TTURH1CED (TTURH1C) is a specific Termination Board designed for the Mark VIe distributed control system. It serves as the physical interface between the field wiring and the control hardware, specifically tailored for turbine control applications. The “TTUR” designation signifies its primary usage in turbine monitoring and control loops, facilitating high-density signal termination for critical inputs like speed sensors, valve feedback, and temperature monitoring.

HONEYWELL ZELLWEGER 05704-A-0145 4-Channel Control Card 4-20mA Image 1 of 2

📋 Technical Specifications

Parameter Specification
Product Name TTUR Termination Board
Model Number IS200TTURH1CED
System Compatibility Mark VIe / Mark VIeS
Core Function Termination and signal conditioning for turbine I/O
Mounting Style Panel-mounted
Terminal Type Screw terminal blocks (or compression lugs)
Diagnostic Features On-board LEDs for loop status and power monitoring
Revision History “H1C” indicates the hardware revision (often interchangeable with newer D/E versions, verify compatibility)

 

🚀 Integration and Application

The TTUR board is a foundational piece of the Mark VIe I/O cabinet architecture. Key integration points include:

  • I/O Packs: Interfaces directly with specific Mark VIe I/O packs that plug into the board to process the incoming field signals.
  • Turbine Sensors: Commonly used to terminate Magnetic Pickups (MPUs) for speed sensing, LVDT/RVDT feedback for valve position, and thermocouple inputs for exhaust gas temperature.
  • Cabinet Wiring: Facilitates the organized transition from heavy-gauge field cables to the backplane-compatible signal path.
  • Shield Grounding: Includes integrated grounding bars to help mitigate EMI/RFI noise, which is critical for sensitive analog turbine signals.

 

⚠️ Installation and Maintenance Note

Because this board handles safety-critical signals, follow these guidelines during replacement:

  1. Part Number Verification: The revision code (e.g., “CED”) is vital. Always ensure that the board revision is compatible with the I/O pack firmware currently in use.
  2. Static Precautions: This board contains sensitive signal-conditioning components. Always wear a grounded ESD wrist strap before handling.
  3. Loop Integrity: Before reconnecting field wires, verify that the field wiring has not been compromised by vibration or heat, as the TTUR board is often mounted in environments where mechanical stress is common.
  4. ToolboxST Mapping: After installation, use ToolboxST to verify that the board is communicating correctly with the controller and that all analog/digital values are being mapped properly to your control logic.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.