Sale!

GENERAL ELECTRIC | DS200TBQAG1ABB | Mark Thermocouple Termination Board

Original price was: $10,000.00.Current price is: $1,052.00.

🔢Product NO:DS200TBQAG1ABB

🏷️Brand:GE

📦Delivery time:  In stock

⚙️Product status:   Brandnew

⚖️Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

🔹 Product Overview

The GENERAL ELECTRIC DS200TBQAG1ABB is an RST Thermocouple Termination Board designed for the GE Mark V Speedtronic turbine control platform.

The board provides the field termination and signal-routing interface for thermocouple circuits. It uses two 90-pin terminal blocks, labeled TB1 and TB2, providing connection capacity for up to 180 signal wires. Three 20-pin connectors provide the interface to associated TCQA and TCCA boards.

The board is particularly relevant to maintenance of existing Mark V turbine control systems where the original termination hardware needs to be replaced without changing the overall control architecture.

⚙️ Main Features

  • GE Mark V DS200 series circuit board
  • RST thermocouple termination function
  • Two 90-pin terminal blocks
  • TB1 and TB2 field termination points
  • Up to 180 signal-wire termination positions
  • Three 20-pin board connectors
  • Interfaces with TCQA and TCCA boards
  • Designed for thermocouple and cold-junction signal routing
  • Revised ABB hardware configuration
  • Suitable for legacy turbine-control maintenance
  • Exact part-number replacement recommended

 

📋 Product Datasheet

Parameter Specification
Brand GENERAL ELECTRIC
Model DS200TBQAG1ABB
Series GE Mark V / DS200
Product Type Thermocouple Termination Board
Board Designation RST Terminal Board
Functional Acronym TBQA
Terminal Blocks 2 × 90-pin
Maximum Signal-Wire Capacity Up to 180 wires
Board Connectors 3 × 20-pin
Connector Interface TCQA / TCCA boards
Main Function Thermocouple signal termination and routing
System Application GE Speedtronic Mark V
PCB Type Industrial control circuit board
Power Passive termination/interface assembly
Installation Existing compatible Mark V system
Condition Verify actual supplied unit

The two 90-pin terminal blocks and three 20-pin connectors are the key hardware characteristics documented for this exact model. The three 20-pin connectors are associated with thermocouple and cold-junction signal interfaces to the TCQA/TCCA boards.

 

🔧 Thermocouple Signal Interface

The DS200TBQAG1ABB is built around the RST termination arrangement used by the Mark V turbine control system.

Its terminal blocks provide the field wiring interface, while the three 20-pin connectors route grouped thermocouple and cold-junction signals toward the associated control boards.

The documented connector assignments include:

  • JAR — TCQA/TCCA thermocouple signals 1–15 and cold-junction signals
  • JAS — TCQA/TCCA thermocouple signals 16–30 and cold-junction signals
  • JAT — TCQA/TCCA thermocouple signals 31–45 and cold-junction signals

This arrangement makes the board more than a simple terminal strip. It is the physical signal-termination point between field thermocouple wiring and the Mark V control electronics.

 

🏭 Typical Applications

The board can be found in legacy GE Speedtronic Mark V installations, particularly turbine-control applications where multiple temperature measurements must be routed into the control system.

Typical maintenance applications include:

  • Gas turbine control systems
  • Steam turbine control systems
  • Turbine temperature monitoring
  • Thermocouple field wiring
  • Speedtronic Mark V cabinets
  • Existing GE DS200 control panels
  • Plant spare-parts inventories
  • Control-system repair and restoration

 

🛠️ Installation & Replacement Guide

1. Confirm the part number

Before installation, verify that the original board is marked DS200TBQAG1ABB or that the equipment documentation specifies this exact replacement.

2. Record the wiring

Photograph TB1, TB2 and all board connectors before removing the original board. On an operating turbine-control cabinet, this can prevent wiring mistakes during replacement.

3. Isolate the equipment

Follow the plant’s lockout/tagout procedure and make sure the associated control circuitry is safely de-energized.

4. Check the replacement board

Inspect terminal blocks, connectors, PCB traces, components and mounting points for physical damage or contamination.

5. Reconnect the field wiring

Use the original terminal assignments and wiring documentation. Do not rely solely on connector position if the cabinet contains multiple revisions of related boards.

6. Verify signal routing

Check continuity and correct channel assignment before returning the control system to service.

⚠️ Important: Thermocouple circuits are channel-specific. Incorrect wiring can produce wrong temperature readings and may affect turbine protection or control functions.

 

🔄 Compatibility & Replacement Notes

The DS200TBQAG1ABB is part of the GE Mark V DS200 board family. GE’s Mark V board family contains several visually similar termination boards, but their functions are different.

For example, the DS200TBQCG1 series is associated with analog milliamp I/O termination, while the DS200TBQBG1 series is identified as an input termination module. The DS200TBQAG1ABB should therefore not be substituted based only on board size or connector appearance.

When sourcing a replacement, verify:

  • Complete catalog number
  • Revision suffix
  • Board identification
  • Terminal-block configuration
  • Connector arrangement
  • Original Mark V cabinet location
  • TCQA/TCCA interface
  • Existing wiring documentation

 

❓ Frequently Asked Questions

Q1: What is the GE DS200TBQAG1ABB?
It is a GE Mark V RST Thermocouple Termination Board used for thermocouple and cold-junction signal termination and routing.

Q2: How many terminal blocks does it have?
The board has two 90-pin terminal blocks, TB1 and TB2. Together they provide termination capacity for up to 180 signal wires.

Q3: How many 20-pin connectors are installed?
There are three 20-pin connectors identified as JAR, JAS and JAT.

Q4: What boards does it interface with?
The documented interfaces are associated with TCQA and TCCA boards for thermocouple and cold-junction signal processing.

Q5: Is this an analog input module?
It is more accurately described as a thermocouple termination/interface board. It provides the field termination and routing function rather than being the primary analog-to-digital input processing board.

Q6: Is DS200TBQAG1ABB interchangeable with DS200TBQCG1ABB?
No. These boards have different functions. The TBQA family is associated with thermocouple termination, while TBQC models are used for analog milliamp I/O termination.

Q7: What should be checked before ordering?
Confirm the complete DS200TBQAG1ABB part number, board revision, terminal-block arrangement, connector layout and the Mark V cabinet application.

 

⭐ Recommended GE Mark V Models

For customers maintaining GE Mark V Speedtronic turbine-control systems, related GE DS200 models include:

  1. GE DS200TBQAG1ABB – RST Thermocouple Termination Board
  2. GE DS200TBQAG1A – RST Terminal Board
  3. GE DS200TBQBG1A – Input Termination Module
  4. GE DS200TBQBG1ACB – Termination Board
  5. GE DS200TBQCG1 – Analog Input/Milliamp I/O Termination Module
  6. GE DS200TBQCG1A – Analog Input/Milliamp I/O Termination Module
  7. GE DS200TBQCG1AAA – Analog I/O Termination Module
  8. GE DS200TBQCG1ABB – Analog Input/Milliamp I/O Termination Module
  9. GE DS200TBQDG1A – RST Termination Card
  10. GE DS200TBCAG1AAB – Analog I/O Terminal Board

These models belong to the same broader Mark V/DS200 maintenance environment, but they are not automatic substitutes for one another.

 

🔍 Inspection Before Shipment

For an industrial terminal board, recommended inspection points include:

  • Exact part-number verification
  • Revision-label inspection
  • TB1/TB2 terminal inspection
  • 20-pin connector inspection
  • PCB trace inspection
  • Component inspection
  • Solder-joint inspection
  • Corrosion and contamination check
  • Continuity testing where applicable
  • ESD-safe packaging
  • Final QC confirmation

Product Identification: GENERAL ELECTRIC DS200TBQAG1ABB
Product Type: RST Thermocouple Termination Board
Series: GE Mark V / DS200
Functional Designation: TBQA
Main Interface: 2 × 90-pin terminal blocks + 3 × 20-pin connectors
Application: GE Speedtronic Mark V turbine control systems

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.