Sale!

WOODWARD | 8272-169 | Generator Loading Control

Original price was: $10,000.00.Current price is: $1,211.00.

Product NO: 8272-169

Brand:WOODWARD

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

Product Datasheet & Technical Parameters

  • Brand: WOODWARD
  • Model: 8272-169
  • Series: GLC (Generator Loading Control) Series
  • Product Name: Generator Loading Control Module
  • Manufacturing Origin: United States
  • Physical Condition: Brand New / Factory Sealed
  • Dimensions: Standard Industrial Enclosure Module
  • Weight: Approx. 2.0 lbs (0.91 kg)
  • Country of Origin: USA
  • Power / Input Rating: 18 to 32 VDC Auxiliary Power Supply, Special Application Listing, Compatible with Woodward EG, 2301, 2500, and EPG series controls

 

Product Overview & Introduction

The WOODWARD 8272-169 is a specialized Generator Loading Control (GLC) unit designed to manage the loading and unloading of AC generators operating in parallel with a utility grid or other generator sets. Distinguished within the GLC series by its specific 18–32 VDC power supply requirement and a unique special application listing, this module ensures smooth, controlled power transitions. It is engineered to integrate seamlessly with other core Woodward control families, including EG, 2301, 2500, and EPG speed control systems, providing reliable base-loading and peak-shaving capabilities.

 

Operational Specifications & Guidelines

Prior to installation or handling, ensure that all electrical power sources, busbars, and control circuits are completely de-energized and locked out to prevent electrical shock or arc flash hazards. Mount the 8272-169 module securely inside a protective sheet metal panel enclosure, maintaining standard industrial temperature and relative humidity limits. Connect the 18–32 VDC auxiliary power supply, potential transformer (PT) voltage inputs, current transformer (CT) lines, and control wiring interfacing with your Woodward EG, 2301, 2500, or EPG governor systems strictly in accordance with the manufacturer’s wiring schematics. Verify all terminal connections and ensure proper system grounding before restoring power.

 

Startup & Shutdown Sequencing

To prevent system disturbances, out-of-phase transitions, or control loop instability, operators must strictly follow the defined startup and shutdown procedures.

  • Startup Sequence:
    1. Verify all external wiring, potential inputs, control power connections, and safety interlocks are securely fastened.
    2. Energize the 18–32 VDC control power supply to the WOODWARD 8272-169 module and perform a complete self-test.
    3. Start the prime mover and allow it to reach rated nominal speed and thermal stability under governor control (using compatible EG, 2301, 2500, or EPG units).
    4. Enable the GLC module to monitor system potential and compare generator parameters against local bus conditions.
    5. Engage automatic loading control, allowing the unit to execute smooth, bumpless soft-loading transitions without voltage or frequency disturbances.
  • Shutdown Sequence:
    1. Gradually initiate soft-unloading via the control module to transfer active electrical load away from the generator set back to the main grid or companion units until minimum baseline load is achieved.
    2. Open the main generator circuit breaker manually or via system command to isolate the unit electrically from the busbar.
    3. Initiate the standard prime mover cool-down cycle at idle speed for the required duration.
    4. Issue the stop command to shut down the engine or turbine completely.
    5. De-energize the auxiliary control power to the loading control module only after the prime mover has come to a complete standstill.

 

Frequently Asked Questions (Q&A)

  • Q1: What sets the WOODWARD 8272-169 apart from other models in the GLC series?
    • A1: It features a specific 18–32 VDC auxiliary power supply requirement and a unique special application listing.
  • Q2: Which Woodward governor and control series are compatible with the 8272-169?
    • A2: This module is designed to work alongside other Woodward product families, including the EG, 2301, 2500, and EPG series.
  • Q3: What is the primary function of this generator loading control unit?
    • A3: It manages the smooth loading, unloading, and base-load regulation of generator sets operating in parallel environments.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.