Sale!

Woodward | 8272-610 | 2301A Load Sharing and Speed Control

Original price was: $10,000.00.Current price is: $1,258.00.

Product NO:8272-610

Brand:WOODWARD

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

The Woodward 2301A Load Sharing and Speed Control Model 8272-610 is an advanced electronic control system designed to provide precise speed and load control for industrial prime movers such as diesel and gas engines, as well as steam and gas turbines. Engineered to allow for automatic generator loading and isochronous load sharing across multi-unit parallel power generation systems, this versatile controller also manages both rated and idle operational speeds, ensuring stable frequency control and seamless power distribution under varying load demands.

⚙️ Product Datasheet & Technical Parameters

• Brand: Woodward (2301A Series)

• Model Number: 8272-610

• Series: 2301A Load Sharing and Speed Control Series

• Product Name: Electronic Load Sharing and Speed Control Unit

• Origin: United States

• Production Status: Active / Industrial Standard

• Dimensions: Standard Enclosure / Panel Mount Configuration

• Weight: Approximately 1.4 kg

• Country of Origin: United States

• Power Consumption: 24 VDC (Nominal)

🔌 Operating Guidelines and Usage Methods

The 8272-610 is designed for panel integration within generator control switchboards or local equipment enclosures. Proper installation requires shielding and grounding all signal wiring, including speed sensor inputs and load-sharing lines, to prevent electrical noise and electromagnetic interference from disrupting control stability. Operators configure gain, reset, speed range, and load-sharing parameters using onboard potentiometers or configuration switches during initial commissioning. Ensure that synchronization and bus-tie interlocks are thoroughly tested before engaging automatic generator loading and parallel tie lines.

🔄 Power-On and Power-Off Sequence

Power-On Sequence: First, verify all external wiring, actuator connections, speed sensor inputs, and parallel tie-line cabling. Next, energize the primary 24 VDC power supply to the control unit. Allow internal circuits to stabilize and verify that operational status indicators show normal health. Once control readiness is confirmed, release the prime mover to start up, allowing it to transition smoothly from idle to rated speed under governor command.

Power-Off Sequence: First, safely unload the generator by transferring real power back to the main bus or shutting down parallel tie breakers to prevent sudden load surges on remaining units. Next, command the prime mover to return to idle and secure the fuel or steam supply valves. Finally, cut off the 24 VDC power supply to the 2301A control unit.

📝 Product Description and Operation Manual

The unit operates by continuously monitoring prime mover speed via magnetic pickup (MPU) signals and comparing it against internal setpoints to modulate the actuator output, thereby regulating fuel or steam flow. In load-sharing mode, it communicates with other parallel controllers via an analog load-sharing line, ensuring each generator shares real power equally in proportion to its rating. The controller features dedicated adjustments for rated and idle speeds, allowing smooth acceleration profiles and stable governing during startup and synchronization phases. Real-time status adjustments can be fine-tuned to match the dynamic response of the specific prime mover.

💡 Frequently Asked Questions (Q&A)

Q: What is the primary function of the isochronous load-sharing feature?

A: Isochronous load sharing allows multiple generators operating in parallel to share active electrical load equally while maintaining a constant system frequency without droop.

Q: How are rated and idle speeds managed by this unit?

A: The controller incorporates distinct circuits and adjustments for low idle speed and high rated operating speed, enabling operators to switch or ramp smoothly between states during startup routines.

Q: Why is proper shielding necessary for the load-sharing lines?

A: Shielding prevents external electrical noise from corrupting the low-level analog load-sharing signal, which could otherwise cause load swings or instability between parallel generators.

Q: Can the 2301A control system operate on standalone generator sets?

A: Yes, the unit can be configured for droop or isochronous speed control on single generator applications where parallel load sharing is not required.

🚀 Recommended Woodward 2301A Series Models

  1. 8272-500
  2. 8272-501
  3. 8272-502
  4. 8272-503
  5. 8272-504
  6. 8272-505
  7. 8272-506
  8. 8272-507
  9. 8272-508
  10. 8272-600

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.