Sale!

WOODWARD | 8440-1024 | SPM-D21 Synchronizer Load Control Module

Original price was: $10,000.00.Current price is: $1,244.00.

Product NO:8440-1024

Brand:WOODWARD

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

Product Datasheet & Technical Parameters

  • Brand: WOODWARD
  • Model: 8440-1024
  • Series: SPM-D21 / SPM-D2 Series (Digital Synchronizer & Load Control)
  • Product Name: Breaker Synchronizer and Load Control Module
  • Manufacturing Origin: United States
  • Physical Condition: Brand New / Factory Sealed
  • Dimensions: Standard APRANORM DIN 43 700 housing (144 \times 72 \times 122 mm)
  • Weight: Approx. 0.8 kg (1.8 lbs)
  • Country of Origin: USA
  • Power / Input Rating: Multi-voltage auxiliary power support, three-phase AC measuring inputs (100–480 VAC compatible), 50/60 Hz frequency range

 

Product Overview & Introduction

The WOODWARD 8440-1024 SPM-D21 is an advanced microprocessor-based digital synchronizer and load control module designed for multi-phase AC generator systems. Engineered to support complex power architectures involving single or multiple circuit breakers, it provides automatic frequency, phase, and voltage matching via configurable analog or discrete output options. By integrating true RMS power calculations, real power (kW) control, and synchronized breaker management, this unit minimizes mechanical and electrical stress during parallel switching operations in industrial environments.

 

Operational Specifications & Guidelines

Prior to installation, ensure that all electrical power sources, busbars, and control circuits are completely de-energized and locked out to prevent electrical shock or arc flash hazards. Mount the SPM-D21 module securely into a standard front-panel cutout using an APRANORM DIN housing layout, ensuring appropriate environmental sealing and ventilation clearances. Connect the AC voltage sensing lines, current transformers, auxiliary control power, discrete inputs, and configurable analog/discrete speed and voltage bias outputs strictly in accordance with the manufacturer’s wiring schematics. Verify all terminal torques and system grounding integrity prior to restoring power. System parameters can be configured directly through the front-panel HMI keypad and display or via Woodward’s standard software toolkit.

 

Startup & Shutdown Sequencing

To prevent breaker tripping, out-of-phase synchronization, or system instability, operators must strictly follow the defined startup and shutdown procedures.

  • Startup Sequence:
    1. Verify all external wiring, potential transformer (PT) inputs, current transformer (CT) connections, control power, and safety interlocks are securely fastened.
    2. Energize the control power supply to the WOODWARD 8440-1024 module and observe the integrated liquid crystal display (LCD) during the internal diagnostic self-test.
    3. Start the prime mover and allow it to reach rated nominal speed and thermal stability under governor control.
    4. Enable the synchronizer module to monitor generator, busbar, and mains voltages, frequencies, and phase angle relationships.
    5. Engage the automatic synchronizing and load-control mode, allowing the device to execute precise speed and voltage adjustments, issuing the close command to the circuit breaker precisely at the synchronous point.
  • Shutdown Sequence:
    1. Gradually transfer active electrical load away from the generator set back to the main utility grid or companion units until minimum baseline load is reached.
    2. Open the generator circuit breaker manually or via system command to isolate the unit electrically from the busbar.
    3. Initiate the prime mover cool-down cycle at idle speed for the required manufacturer-specified duration.
    4. Issue the stop command to shut down the engine or turbine completely.
    5. De-energize the auxiliary control power to the module only after the prime mover has come to a complete standstill.

 

Frequently Asked Questions (Q&A)

  • Q1: What core functions does the WOODWARD 8440-1024 SPM-D21 module provide?
    • A1: The unit provides automatic frequency, phase, and voltage matching, multi-breaker synchronization control, real power management, and comprehensive check-synchronizing safety features.
  • Q2: Can the SPM-D21 interface with non-Woodward governors and automatic voltage regulators (AVRs)?
    • A2: Yes, as long as the external governor or AVR accepts standard configurable analog bias signals (such as \pm 5V, \pm 10V, or current loops) or discrete raise/lower pulses, the SPM-D21 can be fully integrated.
  • Q3: How are parameters configured or adjusted on this module?
    • A3: Parameters can be adjusted directly using the front-panel Liquid Crystal Display (LCD) and keypad interface, or configured remotely via Woodward’s standard software toolkit.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.