Sale!

YOKOGAWA | ANR10D-413 (EB501-13 PW481-11 S2) | Power Supply Configuration

Original price was: $10,000.00.Current price is: $1,240.00.

Product NO:ANR10D-413

Brand:YOKOGAWA

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

This configuration comprises a Yokogawa ANR10D-413 /NDEL node unit housing dual EB501-13 communication/processor modules and dual PW481-11 S2 power supply modules. Engineered for Yokogawa CENTUM distributed control systems (DCS), this rack assembly serves as a high-reliability field control station node. It manages high-speed data acquisition, control loop execution, and robust node-to-node communication, ensuring fault-tolerant performance and high availability in continuous industrial process environments.

📊 Product Datasheet

Parameter Value
Brand Yokogawa
Model / Assembly ANR10D-413 /NDEL with EB501-13 & PW481-11 S2
Series CENTUM DCS Node & Power Distribution Series
Product Name Node Unit with Dual Redundant Power & Communication
Origin Japan / Global Manufacturing
Product Status Active / Industrial Automation Spare Part
Dimensions Standard Yokogawa 19-inch Rack / Node Chassis Form Factor
Weight Approx. 4.5 kg (Complete Assembly)
Country of Origin Japan (JP)
Power Rating Dual Redundant DC Power Inputs (via PW481-11 S2)

🛠️ Operation Standards and Usage Methods

🔸 Handling Precautions: Ensure that the main control cabinet and incoming power feeds are completely de-energized and locked out before installing, servicing, or removing any modules within the ANR10D-413 chassis. Wear a certified anti-static wrist strap to protect sensitive microelectronics.

YOKOGAWA ANR10D-413 /NDEL ,2x EB501-13 s2 ,2x PW481-11 S2 Image 1 of 4

🔸 Installation Procedure: Align the node unit securely within the cabinet frame. When inserting the dual EB501-13 communication modules and dual PW481-11 S2 power supplies, guide them evenly along the internal slot rails until their backplane connectors seat fully, then tighten all front retaining screws.

🔸 System Startup: Energize the dual power feed lines and observe the status LED indicators on the PW481-11 S2 power supplies and EB501-13 modules. Verify normal redundancy synchronization and communication readiness via the CENTUM engineering station software.

🚨 Emergency Shutdown Procedures

🔺 Primary Power Isolation: In the event of an electrical short circuit, smoke emission, or critical system fault, immediately open the primary external circuit breakers feeding the cabinet to cut off all incoming power.

🔺 Maintenance Isolation: When replacing a faulty power supply or communication module, ensure the specific slot or feed is properly isolated to prevent electrical shock or unexpected bus resets.

🔺 Post-Incident Inspection: Allow all internal components to cool and discharge completely before inspecting terminal blocks, wiring harnesses, or internal fuses for damage.

🔍 Troubleshooting and Common Issues

⚠️ Issue 1: Power Redundancy Failure Alarm (PW481-11 S2)

Troubleshooting Method: Check the input voltage terminals on the affected power supply module. Verify that the module is fully seated in its chassis slot and that upstream distribution breakers are closed.

⚠️ Issue 2: Communication Link Fault (EB501-13)

Troubleshooting Method: Inspect all communication cables and network connections linked to the EB501-13 modules. Verify module status LEDs and review system diagnostic logs via the engineering workstation to isolate hardware or bus errors.

⚙️ Routine Maintenance and Care

🔹 Periodic Visual Inspection: Conduct routine monthly inspections of the control cabinet to check for dust buildup, secure terminal screw tightness, and proper operation of cabinet cooling fans.

🔹 Environmental Management: Ensure that the control room or electrical enclosure maintains stable ambient operating temperatures and non-condensing humidity levels to maximize component lifespan.

🔹 Redundancy Testing: Periodically test the failover capability of the redundant power supplies and communication modules during scheduled maintenance windows to ensure seamless backup operation.

💡 Frequently Asked Questions Q&A

❓ Q1: Can the PW481-11 S2 power supply modules be hot-swapped?

💬 A1: Yes, in a properly configured dual-redundant power setup, individual PW481-11 S2 modules can be replaced while the system remains powered, provided redundancy status is verified beforehand.

❓ Q2: What is the primary function of the EB501-13 modules in this node?

💬 A2: They act as communication or processor interface cards responsible for managing data exchange and network communication within the CENTUM control architecture.

❓ Q3: How should spare node modules and power supplies be stored?

💬 A3: Store spare units in their original anti-static packaging inside a clean, dry, climate-controlled environment free from corrosive gases, moisture, and mechanical vibrations.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.