Sale!

Woodward | 8200-208 | ProTech 203 Overspeed Protection System

Original price was: $10,000.00.Current price is: $1,258.00.

Product NO: 8200-208

Brand:WOODWARD

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

Woodward | 8200-208 | ProTech 203 Electronic Two-Out-Of-Three Overspeed Protection System

 

📌 Product Overview

The model 8200-208 is an advanced digital overspeed protection device belonging to Woodward’s ProTech 203 series. Designed for high-integrity industrial safety applications, this energize-to-trip unit displays the actual speed from each independent speed probe, provides clear readouts of the highest speed signal, and supports comprehensive online testing enabled by its modular architecture. Utilizing three separate speed-sensing modules configured in a two-out-of-three voting arrangement, the system continuously monitors prime mover speed to prevent runaway conditions in steam, gas, and hydro turbines.

 

📊 Technical Datasheet Parameters

Parameter Name Specification Value
Manufacturer Woodward
Product Series ProTech 203 Overspeed Protection
Part Number 8200-208
Input Voltage 120 Vac/dc (88 to 132 Vac or 90 to 150 Vdc)
Architecture Type Two-Out-Of-Three (2oo3) Voted Configuration
Physical Dimensions W 19 in x H 12.244 in x D 5.62 in (Approx. 483 x 311 x 143 mm)
Approximate Weight Less than 17 lbs (Approx. 7.7 kg)
Country of Origin United States
Enclosure Standards IP54 / NEMA 4 and 4X Compliant
Operating Temperature -13 to +140 °F (-25 to +60 °C)

 

⚙️ Operating Standards & Installation Methods

  • Handling Precautions: Always apply standard electrostatic discharge handling safeguards when servicing internal sub-assemblies. Verify that all external operating power sources are completely isolated before attempting any physical installation or terminal wiring modifications.
  • Mounting Integration: Secure the single-enclosure unit onto a heavy-duty, vibration-isolated industrial control panel or bulkhead surface using the provided mounting holes, leaving sufficient space for cabinet door clearance and cable entry.
  • Wiring Verification: Ensure that all three independent magnetic pickup sensor cables, power distribution lines, and relay trip output terminals are correctly stripped, shielded, and tightly fastened to prevent signal degradation or intermittent faults.

 

🔌 Strict Startup and Shutdown Sequence

  • Pre-Power Inspection: Check all terminal block connections, verify sensor probe clearances, and inspect ribbon cables to ensure they are firmly seated before system energization.
  • Startup Sequence:
    1. Energize the primary power inputs feeding the system enclosure.
    2. Observe the independent LED status indicators and local displays during the automated self-diagnostic initialization.
    3. Unlock the front-panel enclosure using the key switch only if parameter configuration adjustments are required, then return it to the normal monitoring position.
    4. Arm the primary safety trip loop once all three independent sensing channels confirm operational readiness.
  • Shutdown Sequence:
    1. Perform a controlled normal ramp-down or load reduction of the prime mover when executing scheduled operational shutdowns.
    2. Initiate a manual trip test or allow the voting logic to drop out the trip outputs during emergency safety interventions.
    3. Disconnect the main power feeds to the device only after the protected turbine rotor has achieved a complete mechanical standstill.

 

💡 Product Usage Guide & Maintenance Best Practices

  • Live Monitoring & Testing: Utilize individual touchpads and screens on each module to view real-time probe speeds and highest speed signals. Execute modular online testing by isolating one unit at a time while remaining channels keep the turbine safe.
  • Security Control: Keep the enclosure door locked during regular operation to prevent unauthorized access. Use program mode only when authorized configuration updates are strictly necessary.

 

❓ Frequently Asked Questions (Q&A)

  • Q: How does the 8200-208 handle online testing without causing a turbine trip?
    • A: Because of its modular two-out-of-three voting design, operators can safely test or hot-replace individual modules while the remaining two units continue to monitor the turbine and maintain plant protection.
  • Q: What speed signals can be displayed on the front panels?
    • A: Each module features its own keypad and display to show the exact speed measured by its corresponding speed probe, as well as tracking the highest speed signal across the channels.
  • Q: What type of power supply does this specific part number require?
    • A: Model 8200-208 is configured for a 120 Vac/dc input voltage range.

 

🗂️ Recommended Woodward Alternative Models & Series

  1. Woodward | 8200-200 | ProTech 203 Overspeed Protection System
  2. Woodward | 8200-201 | ProTech 203 Overspeed Protection System
  3. Woodward | 8200-204 | ProTech 203 Overspeed Protection System
  4. Woodward | 8200-205 | ProTech 203 Overspeed Protection System
  5. Woodward | 8200-209 | ProTech 203 Overspeed Protection System
  6. Woodward | 8237-1244 | ProTech-GII Bulkhead Safety System
  7. Woodward | 8237-1367 | ProTech-GII Panel-Mounted Overspeed Device
  8. Woodward | 8237-1594 | ProTech-GII TMR Overspeed Protection System
  9. Woodward | 8237-1601 | ProTech-GII Component Failure Detection System
  10. Woodward | 5437-1080 | ProTech-GII Spare Individual Relay

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.