Sale!

GE 8851-LC-MT Signal Conditioning Module

Original price was: $10,000.00.Current price is: $1,028.00.

Product NO: 8851-LC-MT

Brand:GE

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

  • Model: GE 8851-LC-MT
  • Brand: General Electric (GE)
  • Series: GE 8000 Series I/O System
  • Core Function: High-speed signal processing and I/O communication for DCS
  • Type: I/O Module (Input/Output)
  • Key Specs: High-density signal handling, robust industrial design
  • Module Type: Analog/Digital I/O Processing Module
  • Compatibility: Integrated with GE 8000 Series Control Systems
  • Interface: High-speed backplane connector
  • Signal Processing: Real-time data acquisition and signal conditioning
  • Operating Voltage: +24 V DC (System bus powered)
  • Mounting: Standard rack-mount chassis
  • Protection: IP20 rated housing
  • Operating Temp: -10 °C to +60 °C
  • Diagnostics: On-board LED status monitoring
  • Connector Type: Multi-pin industrial terminal block

Installation & Configuration Guide

Phase 1: Pre-Installation (10 Minutes)

⚠️ Safety First:

  1. Coordinate with operations to initiate a controlled shutdown of the specific loop.
  2. Isolate the power supply to the I/O rack.
  3. Wear an anti-static wrist strap to avoid ESD (Electrostatic Discharge) damage.

Tools: PH1 Phillips screwdriver, label maker, multimeter, and original system documentation.

Backup: If the module is functional, use the configuration software to save the current channel settings. Photograph the current wiring layout, specifically the terminal numbering and field cable colors.

Phase 2: Removal (5 Minutes)

  1. Label all wires connected to the terminal block.
  2. Disconnect field cabling; ensure wires are secured to prevent contact with live components.
  3. Use the extraction levers (or release clips) to disengage the module from the rack backplane.
  4. Carefully withdraw the module and inspect the backplane connector for debris.

Phase 3: Installation (10 Minutes)

  1. Verify the part number GE 8851-LC-MT matches the replacement unit.
  2. Align the module with the chassis guide rails.
  3. Slide the unit in firmly until the backplane connector is fully seated.
  4. Reconnect the field wires according to your photo documentation and labels. Ensure each terminal screw is tightened securely to provide proper contact.

Phase 4: Testing (15 Minutes)

  1. Restore rack power and monitor the status LEDs. A steady “Ready/Run” light indicates successful initialization.
  2. Open the system configuration software to scan for the new module.
  3. Perform a loop check by manually toggling an input/output point to verify signal integrity.
  4. Verify that the SCADA/HMI interface reflects the correct status from the module.

 

Customer Cases & Industry Applications

Case Study: Rapid Restoration for Municipal Water Plant

Situation: A municipal water treatment facility in Northern China utilized a GE 8000 series DCS for pump control. A power surge damaged one of their I/O modules, causing a loss of signal to the main water pressure transmitters.

Task: The plant required an immediate replacement to avoid a total system-wide shutdown, which would have impacted water supply to over 50,000 residents.

Action: The facility manager contacted us for a GE 8851-LC-MT. Due to our localized inventory, we provided a brand-new, original surplus unit. We expedited the shipping, and the module was delivered to the site within 24 hours.

Result: The maintenance team installed the module, performed a quick loop check, and restored pressure monitoring within 30 minutes of delivery. The plant avoided a costly emergency shutdown. The manager noted, “The ability to source a reliable, brand-new module so quickly prevented a major public utility crisis.”

 

Frequently Asked Questions (FAQ)

Q1: Is this module compatible with all GE 8000 series racks? A: Yes, it is designed for the GE 8000 series, but please verify your rack configuration and firmware version. If you are replacing an older revision, ensure your software supports the latest hardware updates.

Q2: How do I know this is not a refurbished part? A: We prioritize transparency. Our modules are New Surplus, meaning they are original factory-stock, have never been installed, and show no signs of usage (no solder repairs or wear on terminal pins). We provide high-resolution photos of the unit, including the original factory labels, for your verification.

Q3: Can I hot-swap this module? A: We strongly recommend against hot-swapping unless your specific system documentation explicitly confirms “hot-swap” capability for this slot. It is always safer to cycle the power to avoid potential electrical spikes that could damage the backplane.

Q4: Does the module require programming? A: The module itself is hardware; however, the control system needs to recognize it in the software configuration. In most cases, simply replacing the hardware will suffice, but it is best practice to perform a quick software check once the module is online.

Q5: What is your response time for technical support? A: We aim to respond to all technical inquiries within 2 hours during business days. For emergency production downtime situations, we provide expedited responses to help get your system back online as quickly as possible.

brand mingpian

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.