Sale!

WOODWARD | 8440-1025 | SPM-D21 Synchronizer

Original price was: $10,000.00.Current price is: $1,211.00.

Product NO:8440-1025

Brand:WOODWARD

Delivery time:  In stock

Product status:   Brandnew

Product situation: one year warranty, Origin of Manufacture

There are still many products that have not been released yet. If you have any products that you cannot find, you can ask me for a quote! Reminder: The product images published on this website are not actual real products and are for reference only!

Description

⚙️ Product Datasheet & Technical Parameters

  • Brand: WOODWARD
  • Model: 8440-1025 (SPM-D21)
  • Series: SPM-D21 / PSV Synchronizer Series
  • Product Name: Two Breaker Synchronizer and Load Control Module
  • Place of Origin: United States
  • Condition Status: Brand New / Factory Original Surplus
  • Dimensions: Standard Panel Mount Enclosure (Approx. 144mm x 144mm x 100mm)
  • Weight: Approx. 1.0 kg
  • Original Region: USA Manufacturing Plant
  • Input & Measurement Specs: Features 2-phase generator voltage, 1-phase generator current, and a 400 VAC input voltage rating

 

📖 Product Overview & Description

The Woodward SPM-D21 (Part 8440-1025) is an advanced microprocessor-based two-breaker synchronizer and load control module designed for use on three-phase AC generators. It is built to operate seamlessly with Woodward or other compatible prime mover speed controls and automatic voltage regulators (AVRs).

The unit integrates multiple power management functions, providing automatic frequency, phase, and voltage matching using either analog or discrete output signals. It handles synchronization independently for a generator circuit breaker (GCB) and a mains/utility circuit breaker (MCB), while incorporating active real power control, power factor regulation, and comprehensive generator and mains protection.

 

🛠️ Operating Specifications & Usage Methods

Proper installation and wiring practices are essential for achieving reliable synchronization and load control. All potential transformer (PT) voltage sensing inputs (handling up to 400 VAC) and current transformer (CT) lines must be wired using shielded cables separated from high-voltage distribution lines to prevent signal distortion and electromagnetic interference.

During system configuration, use the front panel interface or the authorized PC software tool to define nominal system parameters, voltage and frequency thresholds, phase angle limits, and circuit breaker time compensation. Select the appropriate control output mode (analog or discrete bias) to match the specifications of the connected governor and AVR before initiating live grid or bus synchronization tests.

 

⚡ Startup & Shutdown Sequence

Following a structured startup and shutdown sequence protects switchgear components, the generator, and prime mover equipment from mechanical shock and electrical transients.

  • Startup Sequence: First, inspect all auxiliary control circuits, safety interlocks, and circuit breaker mechanisms. Energize the control power supply and verify that all 2-phase generator and bus voltage inputs display accurate measurements on the module’s display. Bring the generator up to its rated operational speed and nominal voltage. Activate the synchronizer mode to monitor slip frequency and phase angle, letting the unit automatically issue close commands to the configured breakers or contactors once all parameters safely align.
  • Shutdown Sequence: Begin by ramping down active power generation through load reduction commands until minimum load is achieved. Open the main generator and mains circuit breakers to decouple the unit from the electrical network. Allow the prime mover to run at a no-load idle state for thermal stabilization cool-down. Issue the stop command to shut down the engine, and finally de-energize the control power supply once all motion has completely ceased.

 

❓ Frequently Asked Questions (Q&A)

      • Q1: What is the primary function of the Woodward 8440-1025 module?
        • A1: It serves as a dual-breaker synchronizer and load control module capable of managing synchronization for both a generator circuit breaker and a mains circuit breaker.
      • Q2: What type of generator sensing inputs does this specific part number support?
        • A2: Part number 8440-1025 features 2-phase generator voltage sensing, 1-phase generator current sensing, and a 400 VAC maximum input voltage rating.
      • Q3: How does the SPM-D21 interface with the engine governor and AVR?
        • A3: It provides automatic frequency, phase, and voltage matching using either configurable analog bias outputs or discrete control signals.

At Newplcdcs, we specialize in providing high-quality spare parts for Distributed Control Systems (DCS) and Programmable Logic Controllers (PLC). Our comprehensive product portfolio includes parts from approximately 20 leading brands, such as ABB, Bently Nevada, Honeywell, GE, Yokogawa, Allen Bradley, Foxboro, Ovation, Hima, Emerson, Triconex, Woodward, ICS Triplex, Bachmann, and Schneider. This focused expertise allows us to offer in-depth solutions in the automation sector, setting us apart from many competitors and ensuring we deliver the most advanced and reliable products to our clients.

Contact Information

Frequently Asked Questions
Is our price competitive?
Newsplcdcs collaborates with over 50 countries worldwide. as a leading supplier in china, we can provide significant discounts to customers based on market demand.
What is the warranty period?
We offer a standard one-year warranty for all new and original items.
What payment methods do we accept?
We accept 100% t/t (telegraphic transfer) before shipping. for items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. if you have an agent in china, please contact us for rmb transfer.
What shipping methods do we use?
We primarily utilize carriers such as fedex, dhl, ups, bre, etc. if you have an account with any of these carriers, you can arrange the shipping yourself. additionally, we offer free shipping to china freight forwarders.
What is our delivery time?
Typically, delivery takes around 1-3 days after receiving the advance payment. for items with a quoted lead time, delivery will occur as per the specified lead time.
How do we package the goods?
Our packaging process involves multiple layers of protection. initially, the product is placed in its original box, sealed with a label. then, we add a layer of bubble wrap to safeguard against collisions during transportation. finally, all products are securely packed in sturdy boxes for further protection.
How can customers contact us and request a quote?
Customers can inquire via email, whatsapp, wechat, skype, or any preferred communication platform. simply reach out to us, and we’ll promptly provide a quote tailored to your needs.