Product Introduction
The GENERAL ELECTRIC PQMII-T20-C-A is a GE Multilin PQM II Power Quality Meter designed for three-phase electrical distribution monitoring, power measurement, and power quality analysis in industrial applications. It combines voltage and current measurement, active and reactive power monitoring, energy metering, power factor measurement, frequency monitoring, and harmonic analysis. The T20 transducer option provides four isolated analog outputs configurable for 0–20 mA or 4–20 mA signals, an additional 4–20 mA analog input, and a second RS485 communication port. The C control option adds programmable relay outputs and switch inputs, while the A power analysis option supports harmonic analysis, waveform capture, event recording, and data logging. With RS232 and RS485 communication interfaces, the PQMII-T20-C-A can exchange electrical measurement data with industrial control systems, PLCs, SCADA platforms, and power management networks. It is suitable for switchgear monitoring, industrial power distribution, generator systems, and electrical maintenance applications.

Technical Datasheet
| Parameter | Specification |
|---|---|
| Brand | General Electric (GE Multilin) |
| Model | PQMII-T20-C-A |
| Series | PQM II |
| Product Name | Power Quality Meter |
| Place of Manufacture | GE Multilin Manufacturing |
| Product Status | Legacy Industrial Product |
| Dimensions | Approx. 186.94 × 110.24 × 21.59 mm (front panel reference; verify mounting drawing) |
| Weight | Approx. 1.49 kg (estimated net weight; configuration dependent) |
| Country of Origin | Canada (refer to individual product nameplate) |
| Power Requirements | 70–265 VAC, 50/60 Hz or 90–300 VDC; 20 VA maximum |
| Analog Outputs | 4 isolated, configurable 0–20 mA / 4–20 mA outputs |
Main Technical Features
- Three-phase electrical power monitoring.
- Voltage and current measurement.
- Active, reactive, and apparent power measurement.
- Energy consumption and power factor monitoring.
- Frequency measurement and harmonic analysis.
- Four isolated analog outputs for external instrumentation.
- One additional 4–20 mA analog input.
- Programmable relay outputs and switch inputs.
- RS232 and dual RS485 communication interfaces.
- Modbus RTU communication support.
- Waveform capture, event recording, and data logging.
- Panel-mounted installation for switchgear and electrical cabinets.
Operating Procedures and Usage Instructions
1. Installation and Preparation
- Verify the complete model number and options against the rear nameplate.
- Check the rated auxiliary power supply before connecting the unit.
- Confirm that the current transformers (CTs) and voltage transformers (VTs) match the electrical system.
- Install the meter in the specified panel cutout.
- Connect voltage measurement inputs and CT secondary wiring according to the wiring diagram.
- Connect analog outputs, relay terminals, and communication cables as required.
- Verify grounding, terminal tightness, and wiring polarity before energizing.
⚠️ Important: Never disconnect an energized CT secondary circuit without following the appropriate CT shorting and isolation procedure.
2. Power-On Sequence
- Confirm that the monitored electrical circuit is in a safe operating condition.
- Verify all auxiliary power and measurement connections.
- Energize the meter’s auxiliary power supply.
- Allow the display and internal electronics to complete initialization.
- Check the display, keypad, and status indicators.
- Confirm that voltage, current, and frequency readings are reasonable.
- Verify communication with the connected PLC or SCADA system.
3. Normal Operating Procedure
- Access the measurement screens using the front-panel keypad.
- Review phase-to-phase and phase-to-neutral voltage readings as applicable.
- Check phase currents and verify CT polarity.
- Monitor kW, kVAR, kVA, and power factor.
- Review energy consumption and demand values.
- Access harmonic measurements and power quality records when required.
- Check alarm conditions and event records.
- Confirm that analog outputs correspond to the configured measurement variables.
- Verify that the host monitoring system receives the correct communication data.
4. Parameter Configuration and Modification
- Access the configuration menus through the front-panel keypad.
- Enter the appropriate programming or setup access level.
- Configure the nominal system voltage and electrical system arrangement.
- Set the CT primary and secondary ratings.
- Configure VT ratios where voltage transformers are used.
- Set the communication protocol, Modbus address, baud rate, and serial communication parameters.
- Assign the four analog outputs to the required measurement variables.
- Configure analog output scaling and alarm thresholds.
- Set relay functions and switch input assignments.
- Save the configuration and verify the displayed measurements against an independent reference instrument.
⚠️ Configuration changes should be performed by qualified electrical or instrumentation personnel. Menu names and available settings may vary with firmware revision.
5. Power-Off Sequence
- Notify the monitoring or control system operator before shutdown.
- Record important measurements and active alarm conditions.
- Disable any external control functions assigned to the meter’s relay outputs if necessary.
- Isolate the meter’s auxiliary power supply.
- Verify that the display has powered down.
- Isolate measurement circuits before performing wiring or maintenance work.
Daily Maintenance and Troubleshooting
Routine Maintenance
- Inspect the front display and keypad for physical damage.
- Check terminal connections for looseness or overheating.
- Inspect communication cables and shielding.
- Verify measurement values against system operating conditions.
- Review stored alarms and event records.
- Keep the panel interior clean and properly ventilated.
- Check auxiliary supply voltage periodically.
Common Troubleshooting
Problem: Display does not start
- Check auxiliary power supply voltage.
- Inspect power wiring and protective devices.
- Verify that the supply matches the product nameplate.
Problem: Incorrect current readings
- Check CT ratios and secondary wiring.
- Verify CT polarity and phase assignment.
- Inspect CT terminal connections.
Problem: Incorrect voltage readings
- Check VT ratios and voltage input wiring.
- Verify phase sequence and system configuration.
Problem: RS485 communication failure
- Check A/B polarity and cable continuity.
- Verify Modbus address and baud rate.
- Inspect termination and network grounding arrangements.
Problem: Analog output deviation
- Verify the assigned measurement variable.
- Check output scaling and receiving instrument configuration.
- Inspect analog wiring and grounding.
Problem: Unexpected relay operation
- Review relay assignment and operating thresholds.
- Check programmed setpoints.
- Verify external control wiring.
Frequently Asked Questions
Q1: What is the GE PQMII-T20-C-A?
It is a GE Multilin PQM II Power Quality Meter with transducer, control, and power analysis options.
Q2: What does the T20 option provide?
It provides four isolated analog outputs, one 4–20 mA analog input, and an additional RS485 communication port.
Q3: What is the function of the C option?
It adds programmable control functionality, including additional relay outputs and switch inputs.
Q4: What is the purpose of the A option?
It provides advanced power analysis functions, including harmonic analysis, waveform capture, event recording, and data logging.
Q5: Can the meter communicate with a PLC?
Yes. Its serial communication interfaces support integration with compatible PLC and SCADA systems using supported communication protocols.
Q6: Can it be used in generator monitoring applications?
Yes. It can monitor electrical parameters in generator distribution and power management systems when correctly configured.
Safety Precautions
⚠️ Always isolate electrical circuits before installation or maintenance.
⚠️ Verify auxiliary power ratings before energizing the equipment.
⚠️ Never exceed the rated voltage, current, or relay contact limits.
⚠️ Follow the manufacturer’s CT and VT wiring diagrams.
⚠️ Only qualified personnel should modify protection-related settings and relay configurations.
⚠️ Back up existing settings before replacing a meter in an operating installation.
Recommended GE Multilin Models
- GE Multilin PQMII-T20 – Power Quality Meter
- GE Multilin PQMII-T1 – Power Quality Meter
- GE Multilin PQM-T20-C-A – Power Quality Meter
- GE Multilin PQM-T1-C-A – Power Quality Meter
- GE Multilin PQM – Power Quality Meter
- GE Multilin 750 – Feeder Management Relay
- GE Multilin 760 – Feeder Management Relay
- GE Multilin 469 – Motor Protection Relay
- GE Multilin 369 – Motor Protection Relay
- GE Multilin 350 – Feeder Protection Relay
- GE Multilin 850 – Feeder Protection System
- GE Multilin 745 – Transformer Protection Relay
- GE Multilin 489 – Generator Management Relay
- GE Multilin 735 – Feeder Protection Relay
- GE Multilin 8 Series – Protection and Control Relays
Note: The recommended models are related GE Multilin product families, not direct drop-in replacements. Verify electrical ratings, communication interfaces, mounting dimensions, and application requirements before substitution.